The preparation is done. Phase 2 begins.
Borehole EM mapped the targets during the pause. Two drills are staged. Kenbridge is ready to go.

The preparation is done. Phase 2 begins.
Borehole EM mapped the targets during the pause. Two drills are staged. Kenbridge is ready to go.
Two drills running simultaneously.
That's not a routine update; it's a signal. Targets defined. Capital committed. PFS timeline moving.
Kenbridge is building with intention.